If a storm has broken, shifted, or dislodged your asbestos cement roof, the debris is hazardous. Do not touch it. We respond across London 24 hours a day — safe containment, temporary weatherproofing, and permanent removal and replacement.
Why storm damage is different
Intact asbestos cement is relatively stable. Storm-damaged asbestos cement is not. When sheets break, crack, or are displaced, the cement matrix is disrupted and fibres are released. This is why storm damage requires immediate professional attention — not a wait-and-see approach.
Asbestos cement roofing contains chrysotile (white asbestos) bonded into a cement matrix. When the material is intact and undisturbed, the fibres are locked into the cement and the risk of release is low. This is why the HSE's guidance allows asbestos cement in good condition to be managed in place rather than immediately removed.
Storm damage changes this. High winds can lift, crack, and dislodge sheets. Falling debris breaks the cement matrix. Broken edges are particularly hazardous because they expose raw asbestos fibres. Wet debris on the ground releases fibres as it dries and is disturbed by wind. The risk profile of storm-damaged asbestos is fundamentally different from intact asbestos.
The correct response is immediate containment — keeping the area clear, preventing further disturbance, and arranging professional removal as quickly as possible. Do not attempt to handle the debris yourself. Do not let a general builder or roofer handle it without UKATA training. The removal must be carried out by a trained operative using appropriate RPE and wet suppression methods, and the waste must be disposed of at a licensed hazardous waste site.
Immediate steps
Do not let anyone — including children and pets — near the damaged area. Broken asbestos cement releases fibres.
Do not attempt to pick up, move, or sweep broken asbestos sheets or fragments. Even small pieces can release fibres.
Call 07344 860932. We respond 24 hours a day. Describe the damage and we will advise on immediate steps and arrange attendance.
If you can cover the area with a tarpaulin from a safe distance without touching the debris, do so. This reduces fibre dispersal from wind and rain.
Call your home insurer to report the storm damage. Most policies cover asbestos removal and replacement. We can provide the quote and documentation they require.
Do not sweep, hose down, or attempt to clean up asbestos debris. This disperses fibres. Leave it for the professionals.
Our emergency response
When we arrive at a storm-damaged asbestos roof, our first priority is containment. We assess the extent of the damage, identify any immediate hazards, and take steps to prevent further fibre release and protect the property from weather ingress.
For most storm-damage jobs, we carry out the work in two stages: emergency containment on the day of attendance, and permanent removal and replacement within 2–5 working days. In some cases — where the damage is limited and the weather is stable — we can complete the full removal and replacement in a single visit.
Most home insurance policies cover storm damage, including asbestos removal and replacement. We work with insurers and loss adjusters regularly and can provide:
From our work
In January 2024, a homeowner in Deptford called us at 7am after a storm overnight had lifted and broken the corrugated asbestos cement roof on their detached garage. Three sheets had been displaced — two had fallen into the garden, one had broken on the driveway. The homeowner had already walked across the driveway without knowing the sheet was there.
We attended within three hours. The driveway sheet was in multiple pieces. We wet it down immediately to suppress fibres, collected the fragments, and double-wrapped them. The two garden sheets were intact but displaced — we wet them, carefully lifted them, and wrapped them. We then assessed the remaining roof structure: four sheets were still in place but two were cracked and at risk of further displacement in wind.
We secured the remaining sheets with temporary fixings, installed a tarpaulin over the entire roof, and cleared the site. The homeowner called their insurer that afternoon. We returned three days later, removed the remaining sheets, and installed a GRP replacement roof. The insurer covered the full cost.
The homeowner's main concern was the exposure from walking on the driveway sheet. We explained that a single brief exposure to asbestos cement fragments — while not desirable — is not the same as the prolonged occupational exposure that causes mesothelioma. The risk from a single incident is very low. The important thing was that they did not continue to disturb the material, and that the area was properly cleared by professionals.
Do not touch the debris. Call us now — we respond across London 24 hours a day.